 June 26, 2025

On a site in the city center of Neumarkt i. d. OPf. that had previously been used as a parking lot, the Max Bögl Group, commissioned by Schwarzachweg Grundbesitz GmbH & Co. KG, created a modern residential and commercial complex that harmoniously blends nature and urban life. In the immediate vicinity of the old town and the vibrant “NeuerMarkt” district, an office and medical practice building as well as two stylish residential buildings with a total of 27 high-end condominiums were constructed. The turnkey construction of the project—which also involved the company’s civil engineering, special foundation engineering, precast concrete plants, and transportation and equipment divisions—was successfully completed in October 2024.

The buildings combine modern living and working with sustainable construction and benefit from their central location, which offers easy access to attractive shopping and recreational opportunities. A four-story block-style building was constructed along Schwarzachweg, primarily housing medical practices and offices. The basement houses state-of-the-art radiation therapy rooms equipped with two 10-MV linear accelerators. Behind the block building, two three-story residential buildings were constructed; these are shielded from the street and create a quiet living atmosphere. The 27 residential units include 2-, 3-, and 4-room apartments ranging in size from 54 to 97 m². While the ground-floor apartments feature private garden areas, the upper floors have balconies. All three buildings are connected by a shared underground parking garage and meet the energy-efficient KfW-40 standard.

 

  • Scope of Work: Turnkey construction
  • Construction Method: Reinforced concrete and masonry structure with semi-precast slabs and in-situ concrete additions
  • Lot Area: 4,400 m²
  • Gross Floor Area: 8,200 m²
  • Office and Medical Practice Space: 2,765 m²
  • Residential area: 2,050 m²
  • Underground parking area: 1,650 m²
  • Number of underground parking spaces: 60
  • Number of apartments: 27
  • Stories of commercial wing: Underground parking, ground floor, and 3 upper floors
  • Stories of residential buildings: Basement, ground floor, and 2 upper floors
  • Precast concrete elements: 250
  • Facade type: Perforated facades with an external thermal insulation composite system and vinyl windows
  • Construction period: March 2023 to October 2024

SCHWARZACHWEG GRUNDBESITZ GMBH & CO. KG

Max-Bögl-Straße 1

92369 Sengenthal

  • Pre-Construction Consulting
  • Building Design in accordance with HOAI §34, LPH 6–8
  • Structural Engineering in accordance with HOAI §51, LPH 6–8
  • Building Services Engineering in accordance with HOAI §55, LPH 6–8
  • Landscape Design in accordance with HOAI §39, LPH 6–8

  • Certification Standard: KfW 55
  • Heat Generation: Local heat supply from a nearby combined heat and power plant
  • Green Roof: 1,400 m²

  • KfW 55 Standard
  • Radiation Protection for Radiation Therapy