Supply and Waste Management

 

Electricity, the Internet, running water, and the smooth flow of wastewater are things people take for granted these days. To ensure future supply and disposal services and meet rising demand, existing sewer and pipeline systems, power transmission lines, and large-scale power distribution networks are being upgraded and maintained while taking environmental, sustainability, and cost considerations into account. In many ways—for a clean future!

Ver- und Entsorgung

For a Better Environment

The wide range of tasks and solutions requires in-depth knowledge and continuous professional development for both management and technical staff. In addition to this ongoing training and professional development, the quality certification marks we have been awarded for sewer construction, gas and water pipeline construction, underground cable installation, and tunneling work demonstrate our commitment to rigorous quality control in the best interests of our clients. Thanks to its diverse portfolio, the Max Bögl Group offers clients one-stop solutions.

Job Openings in Sewer and Pipeline Construction

Range of Services: Utilities and Waste Management

    • Pipeline Construction
    • District Heating
    • Sewer Construction
    • Gas and Water Pipeline Construction
    • Power Lines (DC up to 525 kV / AC up to 380 kV)
    • Noise barrier
    Leistungsspektrum Ver- und Entsorgung

    Certificates / Approvals
    You can find various certificates and approvals related to supply and waste management here.

    Rohrsanierung

    Pipe Rehabilitation

    Pipe rehabilitation refers to the restoration of supply and disposal pipes laid underground. Using new technical methods, the functionality of the pipes can be restored and their service life extended. These techniques differ from conventional pipeline construction primarily in that roads and paths do not need to be dug up along their entire length. This is why the process is also referred to as trenchless pipe rehabilitation. Another advantage of this approach is shorter construction times, resulting in lower costs and reduced environmental impact.

    Trenchless sewer rehabilitation now offers an innovative and cost-effective alternative to conventional open trench / open cut construction. In addition to hose liners, short liners, and remote-controlled robotic systems, the rehabilitation specialists at Max Bögl rely on another liner technique: repairing damaged drinking water and wastewater pipes using the close-fit method.

    Range of Services: Pipe Rehabilitation

    • Pipe Rehabilitation
    • Manholes
    • Close-fit method
    • FRP Pipe Liners
    • Sewer Rehabilitation with KA-TE Robot Systems
    • Rehabilitation of residential and industrial drainage lines