2005

Two precast concrete plants in Liebenau (Lower Saxony) and Hamminkeln (NRW) are taken over and, at the same time, two new locations set up.

 

The steel construction division completes the 9,000 tonne roof and facade structure for the new Munich Allianz Arena.

 

On 15th June, the Commerzbank arena in Frankfurt is officially inaugurated during the Confederation Cup.

 

The Max Bögl Group is awarded the Nürnberg Metropolitan Region "Jobstar" for its special efforts in creating jobs.

 

At the end of June the contract for the use of the FF Bögl Slab Track System for the high-speed Beijing – Tianjin line is signed with the Chinese Ministry of Railways.

 

At the end of 2005, the drinking water supply for the approx. 400,000 inhabitants of Eastern Thuringia is guaranteed with the completion of the last, for the time being, and also, at the same time, highest dam at 102.5 metres.

 

The central building of the BMW plant in Leipzig receives the 2005 German Architecture Award. The geometrically demanding steel works were carried out by the Max Bögl Group.