Bögl’s Segmental Bridge wins Bavarian Engineering Prize 2019

21.01.2019

The Bavarian Engineering Prize 2019 was awarded last Friday to three Bavarian companies for their outstanding, creative and innovative engineering works. For the 10th time already, the Bayerische Ingenieurkammer-Bau (Bavarian Chamber of Engineers for Constructions) awarded the prize worth 10 000 euros. At the 27th Bavarian Engineering Day, Chamber President Dr.-Ing. Norbert Gebbeken and the Bavarian Minister of Construction Dr. Hans Reichhart presented the prize.

Bögl’s Segmental Bridge wins Bavarian Engineering Prize 2019

 


Photo: Max Bögl Group

 

With regard to the evaluation of the objects submitted, originality, creativity, innovation as well as the use of new technologies were the focus by the seven-person jury, which were presided by Dipl.-Ing. Karl Wiebel. The company group Max Bögl won the first prize with its Segmental Bridge, which is Bögl’s innovative new development.

Jury statement:

Bögl’s Segmental Bridge is a new type of prefabricated construction. This system shows a high degree of prefabrication, very short construction periods and the drive way needs no sealing and pavement surface. A characteristic feature is the clear separation of the longitudinal structural system regarding longitudinally and transversely prestressed pavement slabs. These slabs, which are supported on airtight welded boxed steel girders and are pre-tensioned by means of external prestressing in the sideway areas, can be driven on immediately and can be replaced easily. The result is a low-maintenance bridge construction whereby advantages of serial fabrications concerning structural components take its effect.

Technical information on Bögl’s Segmental Bridge:

 

Contact:

Jürgen Kotzbauer
Head of Corporate Communications
Phone: +49 9181 909-10712
E-Mail: jkotzbauer@max-boegl.de

Totalentreprenør på BaseCamp Lyngby, som vinder Årets Byggeri 2020

Totalentreprenør på BaseCamp Lyngby, som vinder Årets Byggeri 2020

18.12.2020

Max Bögl har i samspil med JFP stået som totalentreprenør for det spektakulære byggeri BaseCamp Lyngby, som snor sig elegant igennem det omkringliggende landskab.

Læs mere
Max Bögl og JFP afleverer gigantbyggeriet BaseCamp Lyngby til tiden

Max Bögl og JFP afleverer gigantbyggeriet BaseCamp Lyngby til tiden

07.09.2020

Max Bögl afleverede sammen med JFP gigantbyggeriet, BaseCamp Lyngby til tiden den 1. september. Med 41.150 m2 og coronakrise som del af byggeperioden, er det bemærkelsesværdigt.

Læs mere
Siemens Gamesa and Max Bögl Wind AG sign partnership agreement

Siemens Gamesa and Max Bögl Wind AG sign partnership agreement

24.06.2020

Increased profitability of wind power projects. Siemens Gamesa Renewable Energy, one of the world’s leading wind turbine manufacturers, and the German hybrid tower producer, Max Bögl Wind AG, have agreed …

Læs mere

This website uses cookies. By using our website, you consent to the use of cookies. Learn more ...